| Evaluation Metric | Traditional On-Site Construction | Flat-Pack / Detachable Modular | Volumetric Expandable / Apple Capsule |
|---|---|---|---|
| On-Site Delivery Timeline | 12 – 24 Months | 2 – 4 Weeks | 24 – 48 Hours (Plug & Play) |
| Freight & Shipping Efficiency | High Raw Freight Cost (Unstacked) | Maximum Yield (4-8 Units per 40HQ) | Single Volumetric Module Unit |
| On-Site Labor Requirement | Heavy (Specialized Trades Needed) | Moderate (Assembly Crew) | Minimal (Hookup Technicians Only) |
| Thermal Bridge Mitigation | Variable (Dependent on Field Quality) | High (Factory Insulated Joints) | Continuous Aero-Gel & PU Core Envelope |
| Relocability & Asset Mobility | Zero (Permanent Loss) | High (Disassemble & Move) | Turnkey Mobile Asset (Crane-Ready) |